THE FEASIBILITY OF A PROJECT TO ESTABLISH MAINTENANCE AND REHABILITATION WORKSHOPS FOR GAS AND STEAM TURBINES IN IRAQ TO ACHIEVE SAVINGS AND STOP FINANCIAL WASTE
Keywords:
economic feasibility, electric energy, business enterprisesAbstract
The current study focused on providing a preliminary view regarding the establishment of a project for turbine maintenance workshops for electricity in Baghdad. Moreover, it also focused on efficient maintenance methods and measuring the generated energy. Nonetheless, the results were all positive after estimating the project revenues and operating costs, conducting field surveys, and making all predictions based on the market study. Therefore, we can depend on these results to establish a turbine maintenance workshop project in Baghdad to serve energy projects for the whole electrical system in Iraq. Based on the results of the market study conducted, cash flows, and income statement, the study recommended granting an investment opportunity to establish gas turbine maintenance workshops in Baghdad because all the results were positive for establishing such a project.
Downloads
Published
How to Cite
Issue
Section
License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.